Durand Area Schools 2006 Bond Program

This project included the following: Bertha Neal Elementary: Parking, drainage and vehicle circulation improvements; renovations relative to ADA compliance; Mechanical, Electrical and Finish upgrades Doyle Knight Elementary: Parking, drainage and vehicle circulation improvements; renovations relative to ADA compliance; Mechanical, Electrical and Finish upgrades Robert Kerr Elementary School: Parking, drainage and vehicle circulation improvements; renovations relative […]

East Lansing Public Schools 2008 Bond Program

The Clark Educational Team assisted East Lansing with pre-bond activities including cost estimating, scheduling, and presentations at community forums.  Scope of work for the bond program is outlined below: East Lansing High School Major renovation of existing 150,000 sq.ft building, including HVAC system replacement.  This was a phased renovation and addition project and included construction of a new […]

Lansing School District Pattengill Middle School

The project involved the construction of a new 175,000 sq.ft. Middle School alongside athletic fields and support spaces. The school’s design was modeled after a prototype developed by GMB Architects-Engineers, tailored for urban settings. Additionally, a 27,000 sq.ft. Performing Arts Addition was seamlessly integrated into the new building, accommodating a 750-seat auditorium with dressing rooms, […]

Webberville Community Schools

2004 Bond Program 51,000 s.f. addition to the Jr. High/High School building; gymnasium with locker rooms, weight room, wrestling and aerobics room; new 5,000 s.f. Agricultural Building; new bleachers; Community Health Center; improved site circulation. 2002 Bond Program 8,500 s.f. addition of Media Center, science room, and specialty classroom; new track with events area, fencing, bleachers, and landscaping; 9,700 s.f. […]

Alma Public Schools 2004 Bond Program

This project included: New Middle School: 115,000 s.f. – included auditorium, gymnasium, library, science labs, parking lots, sidewalks, and landscaping Luce Road Elementary: 14,250 s.f. new construction – classroom and office addition Renovations – upgrade kitchen, replace windows, electrical improvements, site improvements Hillcrest Elementary: 5,235 s.f. new construction – library/media center; administrative office. Renovations – […]

Haslett Public Schools 2001 Bond Program

Haslett High School 10,200 sq.ft. new construction – classroom, vocal music room, multi-purpose room, varsity locker rooms, new track and field events area; 67,464 sq.ft. renovation – new heating and air conditioning units for classrooms, major renovations to science rooms and locker rooms. Haslett High School Pool 22,000 sq.ft new construction – 8-lane competition swimming and […]

Howell Public Schools Hutchings Elementary School

As part of the district’s 2001 bond program, Howell Public Schools introduced the new Hutchings Elementary building. The project encompassed a 65,000 sq.ft. structure designed to accommodate 600 students, featuring two playgrounds, a ball field, and two soccer/football fields, accompanied by a one-quarter mile paved driveway with lighting. Beyond the elementary building, the initiative also […]

Howell Public Schools 1999 Bond Program

New Three Fires Middle School 147,600 s.f. new construction – 80-acre site; 1,050 student capacity for grades 6 – 8; building design contains many angles, including the classroom wings which form a “Y” from the common spaces Highlander Way Middle School 18,900 s.f. new construction – classrooms, science labs and mechanical room Major renovations – […]

Crawford Ausable School District Grayling High School Renovations

The Crawford AuSable School District passed a $15.1 million bond program on March 20, 2001 for renovations to their 101,000 s.f. Grayling High School. The project included additions and renovations, with extensive upgrades to the HVAC system. Grayling High School 90,000 s.f. renovations – classrooms, administration offices, auditorium, media center, and extensive renovations to the […]

Dewitt Public Schools

Clark served as Construction Manager for DeWitt Public Schools for two separate bond programs. The first, in 1991, encompassed additions and renovations to Scott Elementary, Fuerstenau School, the middle school, and high school. Then in 1996, we constructed a new 217,000 s.f. high school, including an auditorium with full theatrical stage, 3-court gymnasium, 8-lane swimming pool, full-service kitchen, and site […]