Archives

Warren Woods Public Schools 2017 Bond Program

This 2017 Bond Program consisted of renovations and upgrades to 8 existing buildings that included the Warren Woods Education Center and the Transportation and Maintenance Garage. Scope of work included: • New Construction – Secure/Definable School Entrances; New Building Signage; New Concessions, Restrooms & Team Rooms • Site Work – Playground Upgrades; Replace Asphalt Sidewalks, […]

Haslett Public Schools 2018 Bond Program

This 2018 Bond Program consists of renovations and upgrades to 5 existing buildings that include 3 Elementary Buildings, Middle School, and High School. The District will update all buildings with technology upgrades and new classroom furnishings; additional security at main entrances and throughout the buildings; update heating and cooling systems with energy efficient units, replace […]

Warren Consolidated Schools

The bond program involved renovation/remodeling through two phases of summer construction. • Phase I: Included $14 million construction at 20 different school buildings. Scope of work involved complete renovation of toilet rooms, all new LVT flooring in several schools, mechanical upgrades, parking lot replacements, new football field stadium lighting, interior emergency lighting upgrades, cleaning and […]

Howell Public Schools 2019 Bond Program

The Howell Public Schools 2019 Bond improved a number of different functions within the district’s 12 facilities: Safety and Security: Reconfigure main entrances so visitors must pass by the school office and be screened before entry; Install secure locks with staff-only keycard access on all interior doors; Install a one-button lockdown system to secure schools […]

Orchard Lake Schools St. Mary’s Preparatory High School New Classroom Building

To cater to a surge in enrollment, Orchard Lake St. Mary’s swiftly constructed a new Prep classroom facility covering 30,000 square feet. This masonry-bearing structure houses 20 classrooms, staff offices, a learning stair, gathering areas, and a high-end conference room. The interior boasts a mix of refined finishes such as stained wood paneling, exposed aggregate […]

Washtenaw ISD High Point School 2019 Bond Program

Washtenaw Intermediate School District’s 2019 Bond Program involved the demolition and reconstruction of High Point School. The refurbished gymnasium and natatorium serve alongside new classrooms and specialty rooms for music, art, and therapeutic support. Catering to special-needs students aged 3 to 26, the larger 50,000-square-foot school will feature individualized classrooms, professional spaces for therapy, enhanced […]

Portland Public Schools 2017 Bond Program

The 2017 bond initiative encompassed renovations across five buildings alongside several additional enhancements. Within the Athletic Complex, over $2 million was invested in new construction and upgrades, including expanded grandstands, improved utilities, new concession stands, bathrooms, and the addition of three entrances with bridge features. Furthermore, upgrades were made to parking lots, roads, and site […]

Grand Ledge Public Schools 2019 Bond Program

This 2019 Bond Program consists of renovations and upgrades to 10 existing buildings that include 4 Elementary Buildings, Hayes Intermediate, Beagle Middle School, GL High School, Neff Early Childhood Center and the Dave & Betty Morris Building. This 3 phase program includes the following projects: Major Projects for Phase 1 • Transition to Beagle Middle […]

East Lansing Public Schools

Previous evaluation and assessment of existing K-5 facilities determined that demolition, major renovations and the construction of (5) new elementary schools are necessary to accommodate the needs of the growing district. With this, Clark Construction partnered with East Lansing Public Schools to assist with the following projects: Red Cedar Elementary Building and Site: Major renovation […]

Southgate Community Schools

This three-phase project began in the summer of 2016 and continued through the fall of that year. It commenced again in the summer of 2017. Phase 1 – Summer 2016 – The work completed consisted of adding security entry vestibules and reconfiguring the main office spaces at all four elementary schools, replacement of parking lots […]