Community Mental Health Authority – Building Addition

Construction of a three story addition of approximately 42,600 s.f. to CMHA’s existing facility located at 812 E. Jolly Road in Lansing. The project includes site work, new parking lot, landscaping, associated demolition and new addition  consisting of:  office space, lobby, stairs, elevator, toilet rooms, and clinical space.

Michigan Health and Hospital Admin. Building Addition

The project consists of an approximate 8,000-square foot building addition to be constructed along the north face of the existing MHHA building, as well as an approximate 50,000-square foot expansion of the existing parking lot north of the current parking lot and west of the planned building addition. CCS held the General Trades & Carpentry […]

Henry Ford Health System Royal Oak

  This 6-story, 146,915 sf class A office building that is designed to LEED standards is located in the heart of downtown Royal Oak. The tight urban site is surrounded by city buildings and in a dense traffic area for both vehicles and pedestrians. The Clark team conducted parking impact and traffic studies, along with […]

McLaren Northern Michigan

Presenting the John & Marnie Demmer Wellness Pavilion & Dialysis Center, a groundbreaking two-story, 38,000 sq.ft. medical structure situated within Petoskey’s Lockwood-MacDonald Campus. This modern facility, designed to serve 15,000 patients annually, offers an extensive range of outpatient services. Among its offerings are a 5-bed renal dialysis center, occupational therapy, cardiac and pulmonary rehabilitation, physical […]

Sparrow Eaton Additions & Renovations

Embarking on a multifaceted endeavor, this project unfolded across four phases. Phase 1A introduced an 8,900 sq.ft. surgery addition, seamlessly integrating outpatient surgery staging, recovery areas, staff spaces, equipment storage, and central sterile zones. Coordinating with the owner ensured uninterrupted operation of the existing surgery department during construction, with site work and landscaping enhancements accommodating […]

Helen Newberry Joy Hospital

During Phase 1, the Curtis clinic underwent a transformative process, involving the demolition of its existing modular unit health care facility while retaining the basement. Throughout construction, the staff was temporarily relocated to a medical office building. This phase commenced in July 2021 and concluded in February 2022. The 4,457 sq.ft. Curtis clinic comprised six […]

Martha T. Berry Medical Care Facility

This project encompassed renovations to the main kitchen and existing dining spaces across three floors. Additionally, a new dining addition was constructed, providing seating for 100 individuals. MTB is a County Long Term Care service provider and serves as many as 217 residents at their Elizabeth Road campus.

Beaumont Health System Troy Phased Powerhouse Expansion

The Clark team at the Beaumont Health – Troy Campus completed the steel erection for the new Powerhouse project. Three (3) large CAT generators – 1500KW and 2000KW – were installed through the removable steel roof monitors that sit on the roof structure. The generator exhaust stacks are routed through an eight-story exhaust shaft in […]

Sparrow Health System Starbucks Cafe

The Starbucks Cafe complements Sparrow Health System’s recent renovation to its dining area, the Gathering Place, another successful Clark project. The scope of work for the Starbucks project included demolition of the existing Sparrow cafe kiosk in the first floor lobby and construction of a new Starbucks franchise in the heart of sparrow’s main lobby. […]

Sparrow Hospital Gathering Place

Sparrow Health Systems has brought to life a vibrant “Gathering Place,” where individuals can celebrate, find solace, and indulge in an upscale dining experience. This comprehensive project encompasses two key facets: In Project A, a captivating 2-story Atrium exterior addition stands as the heart of the initiative. This augmented space accommodates a dining capacity of […]